|
Wait Action
|
||
| Definition: | The Wait action causes the AgentSheets scheduler to wait the amount of seconds indicated by a number or a Visual AgenTalk Formula before executing its next command. Use it to slow down simulations.
Note: The Wait action halts the entire simulation. Another alternative is to use the Once Every condition to selectively slow down portions of a simulation. |
|
| Parameters: | formula | |
| Example: | The Frog agent in the Frogger simulation has some delays when controlled with the arrow keys so that it does not move too fast.
|
|
| See the Frogger simulation. | ||
|
| Next | Previous | Reference Manual | Getting Started Manual | |
||